More Laser Cut Building and Kit Bashing

Still working on more laser cut items. Kit bashed a large water tower into something half the size. Finished off all the back walling and integrated the buffer stops. I also made the decision to discard the Plastic built tank engine shed and started to plan the replacement, more on that on the next post – but I will say it utilises the balance of the water tower and one left over wall arches – I love kit bashing!

By the way – the layout will be called ………… Mission Road

IMG_1357

IMG_1358

IMG_1359

IMG_1360

This illustrates an original ‘double’ built kit off another layout. The single is the one I bashed from a ‘double’ kit.

IMG_1361

IMG_1362