Mission Road Update (15/4)

All buildings and walls have now been painted, mortar  (Polyfilla) added and varnished with a ‘dash’ of black paint. Just weathering left to do on some and roof weathering on all.

I have added the doors to the ‘wash out’ shed and redesigned the ‘ash bin’ with slanted sides.IMG_1470IMG_1471

IMG_1472

IMG_1473

IMG_1474

IMG_1476

IMG_1477