Traverser Bolts and loops added

Today has been spent adding the bolts and loops to allow access to all storage on the traverser deck. I also added some track on the first of the two 6′ scenic boards.

I think you will get the idea of what the two track main line will look like. I have taken this option because I wanted to simply show trains running in the country, no station, yard or anything else. This is what 80% of our real railways look like and it is seldom modelled.  I am however considering making a loop on both the up and down lines. These loops will give the viewers at Exhibitions something to see all the while, instead of empty tracks.  It is also potentially two extra storage tracks, only in view of everyone.

The second traverser is not due for another six weeks so the two 6′ scenic sections will be worked on, after a decision on the loops is made. I have many thoughts on what I would like to see on the boards and planning will continue.

IMG_1703

IMG_1712

IMG_1711

IMG_1710

IMG_1709

IMG_1708

IMG_1705

IMG_1704

 

 

 

Traverser Final Amendments.

As I said on the post before this one, I had an idea to increase the length on the other end of the deck. I worked out how I was going to approach it, but discretion being the better of valour, I shelved the project!

The other concern I had was the balance when the deck was totally extended outwards. This I managed to sort by lessening the travel of the deck – I added another point to the innermost two tracks – see photo’s below.

I have made all the bolts and loops for the locking/electric contact system. I have also added the male and female baseboard joiners to the traverser and the first scenic board.

I have also soldered copper clad sleepers to the ends of all tracks for protection.

IMG_1694

IMG_1695

IMG_1693

IMG_1696

IMG_1697

IMG_1698

IMG_1699

IMG_1700

IMG_1701

None of the Bolts and Loops are Screwed and/or glued yet – they need drilling and a handle added.

 

Six Inch extension to the Traverser.

Well, its been quite a day, I turned the four inch extension into a six inch one. I then glued the extension to the traverser, thankfully it worked well. This was first thing this morning and after it was all dry I still had plenty of time left to do some track laying. Out came the gauges to ensure all was equally spaced and track laying commenced.

Below are some photographs of my attempts, the track is lightly pinned so that adjustments can be made, the track will ultimately be glued down when I am 100% happy!IMG_1692

IMG_1690

IMG_1689

IMG_1687

IMG_1684

IMG_1685

IMG_1688

Very happy with the outcome ——–but I have an idea to add another extension to the other end – This is a far more difficult proposition as it needs to be extremely precise.

I have also encountered a possible balance problem when the deck is fully extended – some lead ballast in the base may be necessary.

 

 

Traverser -an extension!?

After making the traverser and testing its capacity, I felt that I would like to find a way to enlarge it slightly, mainly to hold four Mk1 and Mk2 coaches and a medium size Loco.

After much testing and finding some raw materials I began to test a few ideas. Although limited by having only a small amount of wood, I managed to come up with a prototype that would allow a four inch extension and an end stop.

Below are some photographs of the extension, albeit without actually gluing the extra piece on to the traverser.IMG_1674

IMG_1675

IMG_1677

IMG_1678

IMG_1679

IMG_1680

IMG_1681

IMG_1682

IMG_1683

Well, that’s it, four coaches and a Class 31 is now fine – certainly looks better than three. I now need to decide whether to buy some more wood and make a prototype  5 or 6 inch!

Mission Road – Update 04.05.20

After working most of the weekend adding detail to the Steam Shed, here are a few photos to show the progress.

1/ Eleven Railway workers added.

2/  Twelve Yard Lights added.

3/ Wooden walkway added from offices to shed.

4/ Added water crane.

5/ Finished off the two piles of Loco Ash and added wheelbarrows and tools.

6/ Speed Limit signs added.

7/ Finished off coal loader.

8/ Added six dustbins.

9/ Added lots of grass tufts.

10/ Added two cars and four bikes.

IMG_1668

IMG_1659

IMG_1660

IMG_1662

IMG_1663

IMG_1666

IMG_1657

IMG_1661

IMG_1650

IMG_1655

IMG_1656

I have another 11 items on order from Skytrex – they will finish the layout.