Work starts on HO BNSF Layout.

The Baseboard is finished, the basic buildings are done and all other bits are available. Now its time to have a ‘play’ with the track layout and positioning of buildings etc. I think this is going to turn out as a one point layout, I was considering two points, but one seems OK. The one point will be in the fiddle yard and will be manual operation. This is another sector plate, shunting plank really, but with two Loco’s and twelve wagons it could become quite busy.

The track plan and options will continue to be explored. I will post any changes as I discover them.

No Name yet, but as the location is Arizona at a semi desert area, in the mid 1990’s, it will need to be something appropriate.