Further work on O Gauge Stabling Point.

Spent most of the day working on the Baseboards for the new O Gauge Layout. I have added an extra 30mm to the front edges of the laser cut boards . This does three things, obviously it makes the layout bigger, but it makes it just large enough to have four tracks, thirdly it allows for curtain attachment.

I have extended the sector plate by 150mm, it was originally going to be a OO layout.

The first piece of track has been stuck down on the sector plate and some calculations made for other track laying.