Work on N Gauge Layout (29/7)

It has been a very busy two days. I have been adding the polystyrene to the MDF formers that appeared in the previous post. I have started to add a path that runs the whole length of the layout and I have also made a start forming the river banks in 1/4″ Cork. I have used polyfilla to fill any spaces in the polystyrene and to ensure a nice gentle slope down to the track.