A very busy two days working on Osier Common. I would say the second baseboard is now 85% finished.
The Ponds have been enhanced and footpaths on both sides of the tracks have been added. Several trees have been added including two Willows, Osier is a type of Willow, hence the name of the layout. I am waiting for about twenty Gorse Bushes to go on the embankments and around the pond. I will also add several figures walking, hiking, fishing and drawing.
I think I am beginning to see my main reason for making this layout coming to fruition – running trains through countryside.
Looks brilliant Kelvin, well done!
Looks really good! I’m amazed at the speed you work at.
Thanks Dave