After a few days of dodging the rain, I have managed to make the second traverser, added an extension similar to the first traverser and corked the surface.
I have managed to squeeze the layout into the garage and attached it to the second scenic board. I will now add the track, do the wiring and finally do the electrical joiners.
Like the first traverser, the second will have seven tracks with the three longest split into two with isolating switches..
This will give me a total of 20 possible made up trains over the two traversers although it will be filled with only 18 trains maximum. In theory a train can be stored on the scenic sections while a space is made in a traverser.
These traversers will be used on other layouts at a later date.