Between showers today I managed to continue with work on the Stabling Point – board one. I have drilled the hole in the On/Off switch Box, added another scenic back board and started on the bridge that is the start of the fiddle yard/sector plate.
I have designed the fiddle yard so that as well as storing/switching on the sector plate, I can also store two Locos on tracks one and four inside the fiddle yard.