First thing this morning all the extra track turned up and I went straight out and fitted it all to the fiddle yard. I now consider that is the best I can do with KATO track system. During my learning on how to use the track I had assumed that they would produce various curved points! Sadly none could be found on any UK sites – so guess that they do not exist!
The final fiddle yard design finished, I made some between track templates based on the KATO point curved track supplied. Just to clarify, the middle six tracks are through tracks, the first and eighth tracks are sidings with a isolator halfway down each to hold two, two car DMUs etc.
The track will now be lifted and the backboard painted and glued down, after that the fiddle yard area will be corked. The track will then be relayed to the final design. I am looking to pin down the track if possible, if not I will have to investigate another way – we will see.
I had decided from day one of this project that I could not live with surface wiring and that all would be underboard. I also did not want to take the KATO point/power joiners off, I therefore investigated what was the smallest hole I could drill to allow the joiners to pass through, but still be out of sight and under the track. I think a 12mm or 13mm hole will do my wished for outcome.
At the moment I have not really decided on the viewable track at the front of the layout. I have had several ideas from friends including an extra curve in place to a few straights, a bi-directional passing loop or even a Stone Terminal. Whatever decided upon, the two main lines only will have overhead catenary.