I started on this layout in 2021, a N Gauge Layout for my Son, John. Now two years down the line it has been restarted. The baseboards and electrics are complete and some basic landscaping has been done. I now intend to stop all other work for three or four weeks to finish the layout. So there we go – after Covid, lack of money and time I have decided its time to complete what will be called ‘Coopers Common’. The layout is very loosely based on Ely in the 90’s and early 2000’s and is between Ely station and the north junction – I have ‘moved’ the River, the Lakes, the Freight Loop and the Road, but hey its our layout!! The main concept is that both tracks are bi-directional and the loop will be likewise. All lines will eventually have overhead catenary added – I would like to wire them if possible!