A couple of trains have now run on our N Gauge Layout ‘Coopers Common’. The afternoon started by testing and cleaning all track, then the running of a small cement train behind a class 60, followed by a Class 92 Electric in hope that the overheads will arrive eventually! We did a time trial on the inside track and managed to get the slow running down to 3 minutes 45 second per circuit.







