I had a meeting with Graham, the owner/maker of this project today. He has asked me to do the hard standing on the layout based on a concrete loading/unloading area.
As usual in O Gauge I am doing this 3mm Cork – after an overall application I add strips to simulate the blocks as laid by the reinforcing method. The gaps give you a chance to add a few weeds etc. later. Next step is to lay cork between the tracks and fill as necessary.
After completing the above it will be coated with Railmatch concrete paint and then weathered and detailed. It will then be handed back to Graham for completion before a final weathering overall. We are already booked for two Exhibitions later in the year.