Wyke St – OO Update (2)

Spent nearly all day working on the Engine Shed Layout. The inner wall has been added to the now one track upper line, it will be clad with bricks or block plastic sheeting. The extra sections of track have been added to the bottom sidings to increase their length. The two engine shed roads have also been lengthened and stops added. I have started to move the isolating sections after track lengthening, I still have some to do.