Wyke St – update (11)

A long boring job, but it has to be done. Most of the ballasting is done and slowly drying, using three different grades of N gauge ballast and added sand. I have not done around the point blades yet – I always do them separately and very carefully. After that is done, ballast picking all little bits that have got where they should not be and finally a good vacuum overall.