I have been working on the so called ‘Stabling Point’, I am just finishing off the secondary ballasting before a final ‘ballast picking’ session to ensure no pieces have got where they should not be. Then weathering to match board one.
Note the fiddle yard is a bit different to my usual type, this means I can have up to three locos behind the scenes ready to go onto the scenic section. I can also keep some small locos or wagons in the shelving above the track. The point will remain manual at present.



