More work on board 2 stabling point

Two very busy days working on the O gauge stabling point board 2. All track ballasted and weathered, plus modifications in the fiddle yard. Extra protection for the stock on the shelves and extra weight on the sector plate – for smoother operation. All track tops cleaned with track rubber and then vacuumed .

Leave a Reply