Another busy weekend with lots of items added to enhance already added items. I have added the below Photo’s in the order the work was carried out. This I hope gives an insight into the steps made.
Cross wood frame and barbed wire



Duck boards for the trenches

Two types of barbed wire defences

Sand/soil for sand bags


Added grass and skinny shrubs


Extra grass and bushes

