Work on the layout continues, the Car Park is painted, lined and weathered. The Engineers Depot is painted and weathered. The Signal bases have been made and painted together with the associated trunking. Further work has been carried out on the platform including weathering, the Station Building has been selected and detailed.
Being basic electrics, this did not take very long – in fact about an hour. There are three isolating sections on the main scenic board and another three in the fiddle yard. These will give me the flexibility I require. All points operation are manual as they are in the fiddle yard.
The bridge has had further work, the next job being the brick cladding.
With this layout I am trying to show just how simple and basic an Exhibition layout can be. I have ordered a Gaugemaster Combi controller that should be here today.
Next Jobs will be ballasting and them track weathering.