Little Sefton – further progress

Well, as you can see, I have chosen a title for the new pointless O Gauge layout. The title reflects a smaller form of a previous layout.

All the buildings are made and smaller details purchased. The position of the buildings has been decided and await painting. The only thing that may change is the yard crane, the one in the photos below is one I purchased for my station layout that is ‘paused’ at the moment. I have ordered the Peco variant and that is likely to fit this layout better.

I have also purchased two BR vehicles and a further small lorry is likely

Next step will be ballasting and basic scenics, fitting in painting buildings between ballast drying times.