Ballast Glued on Little Sefton

All the ballast/sand has now been glued down and the basic ground cover finished. The ground cover was done using coloured sawdust and sand. The whole layout needs to be allowed to dry for around 24-36 hours.

When all is dry the track will be tidied up by picking all stray bits of ballast etc. from odd places. The sawdust will be taken down and flattened by sandpaper.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s