Further work on Little Sefton (22/12)

Due to bad weather yesterday I had to change my plans and continue with the layout as opposed to doing some Loco/Wagon Spraying.

The track and surrounds are now fully weathered with Railmatch Sleeper Grime and Matt Black, all hand brushed, The buffers have been top coated and weathered. The Coal Staithes have been painted but not yet weathered. The yard Crane has had a coat of Matt Black and will have some parts picked out in Red before weathering.

I have placed all the buildings on the layout and will paint them as I get time. I also intend to have some grassy mounds up against the bridge walls on both sides. I will also make some point rodding to the ground frame.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s