Work on the layout continues, The banks to form the grassy areas has been made, they will now be covered with Mod-roc before painting etc. I have now painted all the buildings and structures, they are basically painted and have had polyfiller rubbed into the brickwork, I then used Coloron Dye to tone the polyfiller down before coating everything with matt varnish. I now need to touch up the corners of the buildings and then weather the lot.
![](https://i0.wp.com/kelvinsrailways.com/wp-content/uploads/2020/12/img_3165.jpg?resize=700%2C525&ssl=1)
![](https://i0.wp.com/kelvinsrailways.com/wp-content/uploads/2020/12/img_3166.jpg?resize=700%2C525&ssl=1)
![](https://i0.wp.com/kelvinsrailways.com/wp-content/uploads/2020/12/img_3167.jpg?resize=700%2C525&ssl=1)
![](https://i0.wp.com/kelvinsrailways.com/wp-content/uploads/2020/12/img_3168.jpg?resize=700%2C525&ssl=1)
![](https://i0.wp.com/kelvinsrailways.com/wp-content/uploads/2020/12/img_3169.jpg?resize=700%2C477&ssl=1)
![](https://i0.wp.com/kelvinsrailways.com/wp-content/uploads/2020/12/img_3170.jpg?resize=700%2C525&ssl=1)