Further work on Little Sefton (31/12)

Again I have been quite busy working on the layout. The bridge is now complete and weathered. I have installed the magnets for the Spratt and Winkle couplings. The basic grassing has been started as has the painting of the backgrounds. The Coal Staithes have been glued down and weathered with spills etc. I still have some sacks of coal and a weighing machine to add.