This is not a full update, but I have spent all day adding the rest of the concreted area and detailing what was laid already. Below are the results, beginning to look a lot better after some of the expansion joints added and a touch of weathering.
Still to be ballasted and desert edges sanded.
![](https://i0.wp.com/kelvinsrailways.com/wp-content/uploads/2021/01/img_3321.jpg?resize=700%2C413&ssl=1)
![](https://i0.wp.com/kelvinsrailways.com/wp-content/uploads/2021/01/img_3322.jpg?resize=700%2C525&ssl=1)
![](https://i0.wp.com/kelvinsrailways.com/wp-content/uploads/2021/01/img_3325.jpg?resize=700%2C495&ssl=1)
![](https://i0.wp.com/kelvinsrailways.com/wp-content/uploads/2021/01/img_3324.jpg?resize=700%2C438&ssl=1)
Sorry photos not great quality.