Hoped to finish the buildings today, but it has been raining heavily and the garage is to damp to complete the job – below are a few photos after being washed and wiped as a base coating. I still need to do some dry brushing and a little air brushing when we have a dry day.
Anyway I think you can see how they have started to blend with the rest of the layout and backboard.
![](https://i0.wp.com/kelvinsrailways.com/wp-content/uploads/2021/02/img_3359.jpg?resize=700%2C456&ssl=1)
![](https://i0.wp.com/kelvinsrailways.com/wp-content/uploads/2021/02/img_3360.jpg?resize=700%2C476&ssl=1)
![](https://i0.wp.com/kelvinsrailways.com/wp-content/uploads/2021/02/img_3361.jpg?resize=700%2C460&ssl=1)
![](https://i0.wp.com/kelvinsrailways.com/wp-content/uploads/2021/02/img_3362.jpg?resize=700%2C477&ssl=1)