Baseboards – change of plans.

As on previous posts, the next layout was to be my Sons new N Gauge Layout, with boards already made. Well, we decided to enlarge the project to 12′ x 3′ from 8′ x 3′. The new board kits have been ordered but they are not due to be delivered until late May, six weeks away.

I have therefore made a decision on my remaining made up baseboards – they will become another O Gauge layout approx 12′ x 18″. I intend to try and make this layout as a bit of a ‘design clever’ with removable items so that a variety of running eras and locations can be used. For example I intend to have removable buffer stops on a bolt on system, one set of traditional stops and another the up to date RAWIE style. Other changes will be different buildings, yard lights and railway staff to enable quick changes to run different eras.

The layout will be a Diesel stabling point as small fuel points to the traditional style have dwindled over the last thirty years or so. I intend to leave room for Loco fuel tank filling from road transport as used nowadays, but no fueling point or its sundry items will be added.

The layout will be DC as I already have a Diesel DCC fueling point in O Gauge, Merlins Lane. The Sector plate will be extended by about four inches and will probably be ‘pointless’

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s