Another day of work on the layout and all the cork in the fiddle yard is down, all holes for points and feeds drilled and all cords put through.
The next task is to connect the cords to the controller and point switches. What to do with all the extra cord under the layout will be a problem. Sadly KATO only do cords in one size and it is inevitable that there is a lot of surplus. To cut and rejoin or just coil and store under the layout has to be decided. After that all the pin holes in the track will be drilled out and track alignment checked one more time, all track pins will then be added.
After a lot of thought is was decided that a loop will be added to the inner track on the scenic area. The track arrived today and it will be worked on shortly.