Work on N Gauge Layout (12/7)

Another day of work on the layout and all the cork in the fiddle yard is down, all holes for points and feeds drilled and all cords put through.

The next task is to connect the cords to the controller and point switches. What to do with all the extra cord under the layout will be a problem. Sadly KATO only do cords in one size and it is inevitable that there is a lot of surplus. To cut and rejoin or just coil and store under the layout has to be decided. After that all the pin holes in the track will be drilled out and track alignment checked one more time, all track pins will then be added.

After a lot of thought is was decided that a loop will be added to the inner track on the scenic area. The track arrived today and it will be worked on shortly.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s