It has been a very busy two days. I have been adding the polystyrene to the MDF formers that appeared in the previous post. I have started to add a path that runs the whole length of the layout and I have also made a start forming the river banks in 1/4″ Cork. I have used polyfilla to fill any spaces in the polystyrene and to ensure a nice gentle slope down to the track.
![](https://i0.wp.com/kelvinsrailways.com/wp-content/uploads/2021/07/img_5399.jpg?resize=700%2C525&ssl=1)
![](https://i0.wp.com/kelvinsrailways.com/wp-content/uploads/2021/07/img_5400.jpg?resize=700%2C525&ssl=1)
![](https://i0.wp.com/kelvinsrailways.com/wp-content/uploads/2021/07/img_5401.jpg?resize=700%2C598&ssl=1)
![](https://i0.wp.com/kelvinsrailways.com/wp-content/uploads/2021/07/img_5402.jpg?resize=700%2C556&ssl=1)
![](https://i0.wp.com/kelvinsrailways.com/wp-content/uploads/2021/07/img_5404.jpg?resize=700%2C525&ssl=1)
![](https://i0.wp.com/kelvinsrailways.com/wp-content/uploads/2021/07/img_5403.jpg?resize=700%2C525&ssl=1)