Coopers Update – 26.09.23

Work continues on the N gauge layout. I have been concentrating on the Ponds and the River, lots of reeds and weeds added using static grass and grass strips, the fishing pegs were made from N Gauge pallets. I have ordered lily pads and flowers to be added later, another varnish coating or two will be added to the lakes when they are ‘planted’.