I worked this morning doing some further work on the O Gauge Layout. I cut the plastic girder that goes in the gap under the bridge, this is a strengthening system that a lot of bridges use. I added the shelf in the fiddle yard and then corked it. Finally I made the pipe holders and glued the dowel to represent the pipe.
Neither the Girder or Pipeline are glued down – needs the bridge to be ‘clad’ first.
I now need to order a few items for the next step, so it may be a little time before another post on this subject.



