Again, about six months ago I was given two parts of a proposed layout. There was a very flimsy main board and a sector-plate fiddle yard board. Both were ready made and had been sparingly glued together, the main board was slightly warped. The main problem was, they were supplied by different Laser-cut baseboard suppliers and had different heights! The group member I was helping with this project wanted them joined together to form a one-piece layout.
As you can see by recent posts the layout was hoping to be used for a O 16.5 layout, and to be honest the boards I was given were meant for a 009 construction! I have just completed the layout after extending the sector plate, joining the boards together, reinforcing both sides and ends, making the whole layout level and finally making an optional entry to the fiddle yard. I also think the backboard height is to small for O 16.5, but the extra cost would have made the project too expensive.
I used nearly £35 worth of wood and glue and three days to complete. The morale of the story – buy all boards required from a proven source with set standards and consider all aspects of what will be needed. Buying cheaply is not always the best policy! The layout will need corking and this should cover up the bad sector-plate design and the horrible bold holes!