OO Layout – Basic Scenery Painting

I have made a good start on undercoating both scenic boards and painting the backscene. All went very well, although I still feel the river could be improved, we will see. I have also painted the MAS trunking with concrete paint, the next step will be the track and ballast painting. Still not sure on what type of bridges I will use, but it will need to be cheap as the whole project is based on using bits and pieces from old layouts.

Board one

IMG_1905

IMG_1906

IMG_1907

IMG_1908

IMG_1909

IMG_1910

Board two

IMG_1911

IMG_1912

IMG_1913

IMG_1914

IMG_1915

The second traverser has turned up, so scenic work will slow down while I make the kit up, lay track and electrify the lot.

Starting to look more like a railway running through scenery now – very pleased with progress.

 

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s