The ballasting and sanding in the yard is now just about finished, the only bit not done is the entry to the sector plate. I have wired two isolating sections on the layout for storage of Loco’s while awaiting a train.
The next task is to complete the wiring to the controller and the yard tracks. The points are manual as they are in the fiddle yard, so the wiring should not take long. After that I will finish the ballasting right up to the sector plate.
I have had lots of pallets, oil drums and crates arrive which will need painting and weathering. I have also obtained six HO figures that I will repaint. I need to get some vehicles both commercial and private cars.