Update 6/02/21 BNSF Layout.

Another busy few days on the BNSF layout. The buildings have now visited the garage for an airbrush and a bit of dry brushing. The main job however was the laying of about 50% of the layout with ballast and sand. After leaving it to dry overnight I then cleaned up all stray bits of ballast and ensured that a wagon ran up and down with no problems. I used a light brown paint to cover the track sides, very little rust here as it does not rain very often and the site is on the edge of an arid desert. The rule is very little rust, but lots of dust and blowing sands. I however will add some spillages and debris later.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s