Today I started to blend the front of the new fiddle yard with the original baseboard. There is a lot to do with the broken down Barn a priority. Graham has ordered a load of 16mm bricks and is actively seeking some appropriate roof tiles. It will be quite a tight schedule as this needs to be complete by September 10th when we are at the Cambridge Model Exhibition with the layout in its new form.
I also took the chance to touch in the flaked paint and replace missing ballast. Humbrol Enamel paints both diluted and neat were used.
![](https://i0.wp.com/kelvinsrailways.com/wp-content/uploads/2022/08/IMG_9848.jpg?resize=700%2C525&ssl=1)
![](https://i0.wp.com/kelvinsrailways.com/wp-content/uploads/2022/08/IMG_9849.jpg?resize=700%2C525&ssl=1)
![](https://i0.wp.com/kelvinsrailways.com/wp-content/uploads/2022/08/IMG_9850.jpg?resize=700%2C525&ssl=1)
![](https://i0.wp.com/kelvinsrailways.com/wp-content/uploads/2022/08/IMG_9852.jpg?resize=700%2C525&ssl=1)