Bowford Update

All the electrics have been done on the layout and the tops of the platforms have been added. The whole layout has been electrically tested and declared working as required. All clearances on the platforms and buildings have also been checked. I still need to sort out the Station building, it needs to have the razor saw taken to it to reduce the width.