One of the worst jobs when making a layout is ballast picking and tidying. In other words removing any ballast that defies gravity! I have also given the ground cover a quick sandpaper to remove and humps and bumps. I will make a few puddles etc. in the ground cover later.
I have painted the Buffer Stops in undercoat and painted the track edges with Railmatch ‘sleeper grime’. When I weather the whole trackage area the edges will get further discoloured.
All the ballast/sand has now been glued down and the basic ground cover finished. The ground cover was done using coloured sawdust and sand. The whole layout needs to be allowed to dry for around 24-36 hours.
When all is dry the track will be tidied up by picking all stray bits of ballast etc. from odd places. The sawdust will be taken down and flattened by sandpaper.
The dry ballasting is done – but how and why did I do it this way? The first thing to remember is what part of the railway you are modelling. This is a small goods yard, it probably has not been re-ballasted of tamped since it was laid, possibly 50 – 100 years, so it must reflect this. I have seen fantastic layouts in both O & OO and they look immaculate as they have been ballasted with mainline ballast. Some very old yards and goods facilities would not have had good ballast when new, let alone after many decades. I would think that some may have even been laid on cinders or similar.
For Little Sefton I am using N Gauge ballast and Childrens Play sand. The heavily used area is about 90% sand and only a sprinkling of the N Gauge Ballast. The less used areas are almost neat N Gauge Ballast.
I have to say I have used several methods of making well used areas look the part, this includes using DAZ Modelling Clay and adding Polyfilla to the dry Ballast – I would say both these methods worked, but I thought I would have a go at N Gauge and Dry Sand, we will see.
After wetting the ballast and using a dropper to add 50-50 PVA and water I will after drying hand paint the whole area.
Well, as you can see, I have chosen a title for the new pointless O Gauge layout. The title reflects a smaller form of a previous layout.
All the buildings are made and smaller details purchased. The position of the buildings has been decided and await painting. The only thing that may change is the yard crane, the one in the photos below is one I purchased for my station layout that is ‘paused’ at the moment. I have ordered the Peco variant and that is likely to fit this layout better.
I have also purchased two BR vehicles and a further small lorry is likely
Next step will be ballasting and basic scenics, fitting in painting buildings between ballast drying times.
Yet more work on the new pointless layout. The Goods Shed is complete, the Yard Crane is undercoated and the Coal Staithe has arrived. I have made the three required Buffer Stops and most importantly I have made a Small Bridge that will carry a pipeline over the yard. I have used the pipeline bridge on several layouts, I can not stand ‘a cut out in the sky method’ . All the above need painting and weathering. I still have a few options on Huts etc. but due to current postal deliveries being very late – I still await some parcels.
Nothing complicated here, just a few options for running trains. The fiddle yard is connected to the controller and then all three scenic tracks are connected to the fiddle yard. I have added three ON/OFF switches to the three scenic tracks so that you select which track you want to use if running more than one Loco. There is also a standard isolating switch on the nearest track for shunting manoeuvres. I am using a Gaugemaster Combi Controller as only small DC Locos will be used.
Now for a good clean up and continue making buildings for the layout.
It was never my intention to buy a Hattons Warwell, but a reduction in price tempted me, and I have to say – very impressive. I have given the pair a light weathering only.
Another story of buying from the Dapol Sale and liking the wagons so much I purchased another to make a rake of three. I re-numbered the new wagon and decided to make it a bit dirtier than the original two.
As stated in a previous post I purchased some items from the recent Dapol Sale. Well, I was so pleased with the Banana Vans that I purchased another one to make a rake of three.
Since adding my first post on this project, I have continued to progress the layout. All back scene boards have been added and an extra inch added to the front of the layout to set the track a bit further back and to pin the curtain to when finished.
I have added extra space to the fiddle yard to hold a couple of wagons awaiting use, I have also added a board to partly conceal the sector plate.
I have purchased a goods shed (Lcut Creative), Coal Merchants Staithes (Skytrex) Four lever pad (Scenecraft)